    Abstract: Photos from a  scrapbook showing construction of dams on the Heart River, specifically the  Heart Butte Dam and Dickinson Dam.
    
    Provenance: The  collection was acquired by the State Historical Society from John Ehrenhard on  February 14, 2018.
    
    Property Rights: The State Historical Society  of North Dakota owns the property rights to this collection.
    
    Copyrights: Copyrights to  this collection remain with the donor, publisher, author, or author's heirs.  Researchers should consult the 1976 Copyright Act, Public Law 94-553, Title  17, U.S. Code or an archivist at  this repository if clarification of copyright requirements is needed.
    
    Access: This  collection is open under the rules and regulations of the State Historical  Society of North Dakota.
    
    Citation: Researchers are  requested to cite the collection title, collection number, and the State  Historical Society of North Dakota in all footnote and bibliographic  references.
    
    PHOTOGRAPHS INVENTORY
    
00001 Dickinson  Dam sign              
00002 Heart  Butte Dam looking west along spillway  trench July 7, 1948
00003 Heart  Butte Dam concrete placing operation for  spillway collars July 7, 1948
00004 Heart  Butte Dam aggregate batching plant showing  Pioneer Machinery Co. conveyor belt and screens, aggregate storage bins and  washing equipment July 17, 1948
00005 –  00007 Heart Butte Dam concrete placing July 17, 1948
00008 Heart  Butte Dam placing of the inside barrel July  23, 1948
00009 Heart  River flood on August 9, 1948
00010 Heart  Butte Dam flood on August 9, 1948
00011 Heart  River flood  
00012 Heart  Butte Dam construction        
00013 –  00016 Heart Butte Dam looking west from Spillway Sta. 15+70 August 12, 1948
00017 Heart  Butte Dam construction        
00018 –  00019 Heart Butte Dam construction from south abutment showing status of cutoff  trench excavation September 1, 1948
00020 –  00021 Heart Butte Dam construction cutoff trench cleanup prior to the start of  backfilling September 1, 1948.
00022 Heart  Butte Dam construction showing contractors irrigation methods used in the  northeast borrow area September 1, 1948
00023 Heart  Butte Dam construction from south abutment showing the start of cutoff trench  backfilling September 2, 1948
00024 Heart  Butte Dam construction in cutoff trench showing hauling and spreading equipment  being used by the contractor September 2, 1948
00025 –  00026 Heart Butte Dam construction at the beginning of cutoff trench  backfilling operations and showing the two Gebhard Type sheeps foot rollers  being used by the contractor September 2, 1948
00027 Heart  Butte Dam construction        
00028 –  00029 Heart Butte Dam construction looking west from a point opposite Spillway  Sta. 15+70 to show work progress September 16, 1948
00030 –  00031 Heart Butte Dam construction showing excavation and loading in the  Northeast borrow area September 16, 1948
00032 Heart  Butte Dam construction looking south from Axis Station 15 October 13, 1948
00033 Heart  Butte Dam construction looking north from Axis Station 3+40 October 13, 1948
00034 Heart  Butte Dam construction looking east from Spillway Sta. 3+35 October 13, 1948
00035 Heart  Butte Dam construction looking west from point right of Spillway Station 15+70  to show work progress October 13, 1948
00036 Heart  Butte Dam construction showing final stages of cutoff trench cleanup near  Station 7 October 4, 1948
00037 Heart  Butte Dam construction from point 400 feet left of Sta. 13+20 to show work  progress. October 13, 1948
00038 Heart  Butte Dam construction showing concrete placement in spillway chute November  10, 1948
00039 Heart  Butte Dam construction showing placing of steel for stilling basin wall  November 10, 1948
00040 Heart  Butte Dam construction looking north from Station 3+40 March 2, 1949
00041 Heart  Butte Dam construction looking west from a point offset right of spillway  Station 15+70 March 2, 1949
00042 Construction  equipment at Heart Butte Dam           
00043 Heart  Butte Dam construction showing placement of concrete in conduit closure  erection April 11, 1949
00044 –  00045 Heart Butte Dam construction showing the placement of concrete in the  spillway structure April 14, 1949
00046 Heart  Butte Dam construction showing placement of concrete in stilling basin walls  April 19, 1949
00047 Heart  River after breakup looking north from Heart River bridge
00048 Relocated  Highway 49 north of Heart Butte Dam
00049 Glen  Ullin Central Control Laboratory
00050 –  00051 Dickinson Dam construction showing the placing of wellpoints May 5, 1949
00052 –  00053 Heart Butte Dam construction showing the placement of plastic tubing for  piezometer installation at Station 10 May 13, 1949
00054 Heart  Butte Dam construction from parapet wall and looking into the stilling basin  May 20, 1949
00055 Heart  Butte Dam construction looking upstream from spillway Station 15+50 to show  completed stilling basin spreaders and chute block May 20, 1949
00056 Heart  Butte Dam construction showing removal of large trees May 20, 1949
00057 Heart  Butte Dam construction showing back-filling operations around the base of the  spillway structure May 20, 1949
00058 Dickinson  Dam construction looking north from Station 7+00 May 23, 1949
00059 Dickinson  Dam construction looking south from about Station 15 to show excavation  operations in the cutoff trench May 23, 1949
00060 Heart  Butte Dam construction looking upstream from Spillway Station 15+50 to show the  completed concrete stilling basin May 25, 1949
00061 Heart  Butte Dam construction showing the placement of reinforced steel in the gate  chamber for the spillway and outlet works May 25, 1949
00062 Heart  Butte Dam construction showing the operations of watering and processing  material for use in backfilling along the spillway and outlet conduit May 26,  1949
00063 Heart  Butte Dam construction showing backfilling operations adjacent to spillway  structure May 26, 1949
00064 Heart  Butte Dam construction showing the backfilling operations along the spillway  conduit May 27, 1949
00065 Heart  Butte Dam construction        
00066 Dickinson  Dam construction showing use of rock-ripper to remove rock ledge extending  across bottom of cutoff trench near Station 10+50 June 6, 1949
00067 Dickinson  Dam construction showing the condition of cutoff trench between Station 10 and  13 just prior to final cleanup June 10, 1949
00068 Heart  Butte Dam construction showing the placement of a 3/4 inch piezometer pipe by  means of a water jet June 11, 1949
00069 Heart  Butte Dam construction showing the foundation cleanup operations within Zone 1 June  11, 1949
00070 Heart  Butte Dam construction showing the placement of concrete in the gate chamber  June 11, 1949
00071 Dickinson  Dam construction looking south from about cutoff trench Station 13+50 to show  earthwork progress within the cutoff trench June 16, 1949
00072 Dickinson  Dam construction showing cleanup operations in the river channel upstream from  the cutoff trench June 16, 1949
00073 –  00075 Heart Butte Dam construction showing placement of piezometer tips June  23, 1949
00076 –  00077 Dickinson Dam construction showing first concrete placement in spillway  cutoff trench July 1, 1949
00078 Heart  Butte Dam construction. Euclid bottom dump truck dumping material in a windrow as  a part of the placing operations July 7, 1949
00079 Heart  Butte Dam construction showing bulldozer spreading the windrowed material July 7,  1949
00080 Heart  Butte Dam construction showing a 4000 gallon tank wagon adding supplemental  water on the embankment July 7, 1949
00081 Heart  Butte Dam construction. A 27 inch disk being used to process material on the  embankment July 7, 1949
00082 Heart  Butte Dam construction showing placement of one section of a settlement  crossarm installation July 7, 1949
00083 Heart  Butte Dam construction showing placement of compacted backfill along south side  of the spillway conduit July 12, 1949
00084 Heart  Butte Dam construction showing a worker making the connection between the 12  inch concrete pipe toe drain and outfall July 12, 1949
00085 Heart  Butte Dam construction from rock point 400 feet left of Station 13+20 July 12,  1949
00086 Dickinson  Dam construction showing placement of gravel drain and barrel sump in seep area  just upstream from cutoff trench near Station 11+50 July 8, 1949
00087 Heart  Butte Dam construction. Installing piezometer tubing in Station 6+75 piezometer  well July 22, 1949
00088 Heart  Butte Dam construction. General view of the spillway and outlet structure  showing the placement of reinforcing steel and forms for the columns and struts  July 27, 1949
00089 Dickinson  Dam construction. Unloading a gravel car using a Barber-Greene truck loader  July 28, 1949
00090 Dickinson  Dam construction. A general view of concrete placements and form construction  operations in the spillway area July, 29, 1949
00091 Dickinson  Dam construction showing form and reinforcement steel for the spillway crest  section C-4 July 29, 1949
00092 Heart  Butte Dam construction. Close-up view of concrete placing in column for the  spillway and outlet works July 30, 1949
00093 Dickinson  Dam construction. General view of embankment operations in cutoff trench area  north of diversion channel August 2, 1949
00094 Dickinson  Dam construction. Embankment construction in the cutoff trench just north of  river diversion channel August 2, 1949
00095 Heart  Butte Dam construction from point 707 feet right of Station 13+03 August 2,  1949
00096 Heart  Butte Dam construction looking west from a point near Spillway Station 23  August 2, 1949
00097 Dickinson  Dam construction. Checking reinforcing steel just prior to placement of floor  section No. R-4 August 8, 1949
00098 Dickinson  Dam construction showing excavation for the cutoff trench at a lower end of the  spillway August 16, 1949
00099 –  00100 Heart Butte Dam construction showing the placement of a 12 inch open  joint concrete pipe toe drain August 16, 1949
00101 Heart  Butte Dam sign at the visitors’ view point located on the south abutment for  the dam August 19, 1949
00102 Heart  Butte Dam construction from point opposite Spillway Station 15+75 August 19,  1949
00103 Heart  Butte Dam construction from rock point 400 feet left of Station 13+20 August  19, 1949
00104-01 –  00104-02 Dickinson Dam construction from Spillway Station 7+99.22 to show  construction progress at lower end of spillway August 19, 1949
00105 Dickinson  Dam construction looking down the center of the spillway to show construction  progress at the upper end of the spillway August 19, 1949
00106 Heart  Butte Dam construction showing general condition of riprap placed prior to  August 23, 1949
00107 Heart  Butte Dam construction. Void in the upstream rock riprap in which the  sand-gravel is visible August 23, 1949
00108 Dickinson  Dam construction showing the concrete placing in the Section R-9 August 29,  1949
00109 Dickinson  Dam construction showing concrete placing and finishing in the Section R-9  August 29, 1949
00110 Heart  Butte Dam construction. Scarifier being used to rake oversized rock out of the  Zone 1 material September 1, 1949
00111 Heart  Butte Dam construction showing condition of embankment surface just prior to  and during rolling operation September 1, 1949
00112 Heart  Butte Dam construction showing the stripping of the outside form for the hoist  shaft September 1, 1949
00113 Dickinson  Dam construction. Workers using water and vibratos to consolidate the  sand-gravel blanket for the P-5 section of the spillway September 2, 1949
00114 Dickinson  Dam construction. Workers excavating spillway cutoff trenches into the Fort  Union Formation September 2, 1949
00115 Heart  Butte Dam construction. Shovel and Euclid working in the northeast borrow area  September 7, 1949
00116 Heart  Butte Dam construction showing the relatively heavy gravel strata running  across the south side of the northeast borrow area September 7, 1949
00117 Dickinson  Dam construction showing progress in the closure section of the cutoff trench  between Station 13+50 and Station 16 September 15, 1949
00118 Dickinson  Dam construction from a point beyond the upstream toe to show work progress in  the diversion channel at Station 14+50 September 15, 1949
00119 Heart  Butte Dam construction showing workers placing rock by hand to fill large void  spaces on the upstream riprap September 15, 1949
00120 Heart  Butte Dam construction from rock point 400 feet left of Station 13+20 September  15, 1949
00121 Heart  Butte Dam construction looking north from Station 4+20 September 15, 1949
00122 Heart  Butte Dam construction from Spillway Station 23 September 15, 1949
00123 –  00125 Heart Butte Dam construction inside the form for the glory hole spillway  structure to show forming reinforcing steel and placement of concrete September  16, 1949
00126 Heart  Butte Dam construction showing the operation of watering and mixing material on  the embankment September 19, 1949
00127 Heart  Butte Dam construction showing an Alice-Chalmers Model HD-5 tractor equipped  with front end loader being used to pick up rock on the embankment September  19, 1949
00128 Dickinson  Dam construction. E-1 Panel following stripping and application of curing  compound September 23, 1949
00129 Heart  Butte Dam construction from Spillway Station 23 September 28, 1949
00130 Heart  Butte Dam construction from a point 707 feet right of Station 13+03 September  28, 1949
00131 Heart  Butte Dam construction from a point upstream from the dam showing progress on  the embankment and on the upstream riprap September 28, 1949
00132 Dickinson  Dam construction looking north from about Station 12 September 23, 1949
00133 Heart  Butte Dam construction. Engineers taking readings at Settlement Crossarm  Installation "B" following the setting of a crossarm September 27,  1949
00134 Heart  Butte Dam construction from a rock point 400 feet left of Station 13+20 September  27, 1949
00135 Dickinson  Dam construction showing the placement of reinforcing steel in the spillway  wall No. R-3 September 28, 1949
00136 Heart  Butte Dam construction showing the gravel being placed into the loading hopper  at the gravel plant October 4, 1949
00137 Heart  Butte Dam construction showing the conveyor belt used to move gravel from the  loading hopper to the screening plant October 4, 1949
00138 Dickinson  Dam construction showing the contractor's screening plant, storage bins, and  batch scale October 5, 1949
00139 Dickinson  Dam construction showing the front end loader being used to move gravel from  stockpiles to the screening plant October 5, 1949
00140 Dickinson  Dam construction. Progress at the downstream end of the spillway October 5,  1949
00141 Heart  Butte Dam construction showing the placement of concrete in the training piers  for the outlet works October 6, 1949
00142 Heart  Butte Dam construction. Upstream riprap October 6, 1949
00143 Heart  Butte Dam construction. Upstream rock riprap and the tight well bonded surface  being obtained by the contractor's placing operations October 6, 1949
00144 Heart  Butte Dam construction from Spillway Station 23+00 October 31, 1949
00145 Heart  Butte Dam construction upstream from the dam October 31, 1949
00146 Dickinson  Dam construction on the downstream portion of the spillway November 1, 1949
00147 Dickinson  Dam construction showing workers taking the check density sample from power  tamped backfill November 1, 1949
00148 Dickinson  Dam construction showing workmen using a sand comb to determine the volume of a  test sample November 1, 1949
00149 Heart  Butte Dam construction showing workmen applying special finish between conduit  Station 7+25 and Elevation 2034 of the inlet structure November 2, 1949
00150 Heart  Butte Dam construction portable screen for screening road gravel November 14,  1949
00151 Heart  Butte Dam construction road gravel screening operation November 14, 1949
Address:
	612 East Boulevard Ave.
  Bismarck, North Dakota 58505
	Get Directions
Hours:
	  State Museum and Store:  8 a.m. - 5 p.m. M-F; Sat. & Sun. 10 a.m. - 5 p.m.
We are closed New Year's Day, Easter, Thanksgiving Day, and Christmas Day. We are closed at noon Christmas Eve if it falls on Mon.-Thurs. and are closed all day if it falls on Fri.-Sun.
	  
	  State Archives: 8 a.m. - 4:30 p.m. M-F, except state holidays; 2nd Sat. of each month, 10 a.m. - 4:30 p.m. Appointments are recommended. To schedule an appointment, please contact us at 701.328.2091 or archives@nd.gov.
    State Historical Society offices: 8 a.m. - 5 p.m. M-F, except state holidays.
Contact Us:
phone: 701.328.2666
email: history@nd.gov
Social Media:
		See all social media accounts